Skip to content

Special report: HVB pipeline

Since the end of 2021, VALEMO has been operating high voltage substations connected to the RTE transmission network.

Given the production stakes and the requirements of the RTE network operator (response time of less than 5 minutes), VALEMO has decided to set up an on-call team dedicated to this activity, consisting of 6 experienced technicians.

This on-call team deals with all alarms and requests (calls / SMS / emails) that may arise, 24 hours a day, 7 days a week.

In addition to this on-call team, VALEMO has recruited an experienced electrical engineer as a technical HVB referent to supervise remotely and in the field the teams working on this new activity.

This organization will be completed in 2023 with the transition of the Control Center to 5x8h (operator on duty 24/7).

To prepare this evolution, VALEMO has initiated the steps with RTE to equip itself with a Secure Telephony System (STS) and an Alert and Backup System (SAS); these equipments are mandatory for the safety of the network as soon as the power of the substation exceeds 40 MW or the connection voltage goes to HTB2 (>= 150 kV).

This activity has been ramped up throughout 2022, so VALEMO currently operates 3 HV substations:

SiteVoltage (HTB/HTA)Transformer(s)*Connected PowerProducersSpecial equipment
SRN (10)90 kV / 20kV2 x 45 MVA75 MW9 wind farmsPower unit
PEC (11)63 kV / 20 kV1 x 15 MVA11 MW1 wind farm
HYPER (80)63 kV / 33 kV1 x 50 MVA45 MW3 wind farmsSTATCOM

*Power indicated in ONAF

On these new assets, VALEMO carries out the following missions in particular:

  • Single entry point for RTE,
  • Programming Manager for RTE,
  • Remote control of installations (supervision and manoeuvres),
  • Consignment/unconsignment of HV and MV equipment,
  • Remote diagnosis of failures and alarms,
  • Triggering of on-site interventions and removal of doubts,
  • Organization of the preventive and curative maintenance of the station,
  • Coordination of the different actors (wind, PV, battery producers, etc.),
  • Supervision of subcontractors and contractors (regulatory controls, green spaces, pest control, etc.).

As close as possible to the HV substations, VALEMO has also trained its employees at the maintenance bases (located on average 1 hour away) in the environment, operation, consignment and diagnosis of HV equipment.

Actualités

VALEMO and RES on Saint-Brieuc substation.

Initiated in 2018 through punctual maintenance missions on the offshore electrical substation of the Arkona wind project (in the Baltic Sea, Germany), completed in 2022 with remote supervision services for the electrical substation of the Saint-Nazaire offshore wind project, VALEMO continues to
Lire la suite

Blade inspection : Anticipate major problems.

Since 2014, VALEMO has been performing visual inspections of wind turbine blades from the ground. These inspections allow the detection of defects on the blade coatings and structures. About 15 technical staff are trained in on-site data acquisition, using a 600 mm
Lire la suite

TRAININGS : VALEMO wants the best for its employees.

This year again, VALEMO has continued its investment in safety training for its employees. All our maintenance technicians and technical support staff are trained to the GWO standard. During the year 2022, 26 employees have been trained to GWO Basic Training (Working
Lire la suite